Frankfurt, Germany
The new S-Bahn connection Gateway Gardens includes the relocation of the route between Frankfurt Stadium and Frankfurt Airport Regional Station as well as the construction of the new Gateway Gardens traffic station. The new line is divided into 16 construction phases and comprises a tunnel length of approx. 2,000 m, consisting of a rectangular tunnel profile. The order also includes several station structures.
By utilizing cutting-edge technology and a collaborative mindset, we optimize the structural design process, ensuring accuracy, safety, and sustainability at every stage of the project.
Location
Services
Segment
Partner with a leading expert to discuss your project requirements and bring your vision to life