Extension of Munich Metro Line U5 to Pasing

Munich, Germany

Project Description

The city of Munich is expanding the underground network in the west of Munich and by extending the U5 line from the existing Laimer Platz station to Pasing. The new underground line has a length of around 3.8 kilometres and is being built in two sections. Construction lot 1 comprises the section between the existing Laimer Platz station in the east and the new Willibaldstraße station to be built in the west. The underground railway construction work in lot 1 is carried out using the diaphragm wall/cover construction method.

 

The total length of the construction is approx. 1.000 meters.

 

(Photo: Münchner Verkehrsgesellschaft)

Our Work

Our primary focus is on the use of the diaphragm wall/cover construction method for underground railway works. This includes designing and assessing the structural framework of the underground sections, ensuring the stability of the diaphragm walls, and coordinating the construction of the tunnel and stations.

Location

Munich, Germany

Services

  • Structural Design, work stage 5 (LP5) for tunnel block 01 bis 103 incl. interior fit-out, accesses, stairs, platforms, and diaphragm walls
  • As-built Drawings
  • BIM Services

Segment

Transportation & Infrastructure Projects

Other Projects

Segments

Segments

Projects

Projects

Ready to build a long-lasting legacy?

Partner with a leading expert to discuss your project requirements and bring your vision to life