Projects

Tunnel Bertoldshofen

Marktoberdorf and Bertoldshofen, Germany

Project Description

The connecting roads of Marktoberdorf (B 16) and Bertoldshofen (B 472) were relieved by the construction of bypasses and the joint connection to the B 12. The construction focuses on section 2 with a length of 6.3 km including the Bertoldshofen tunnel with a length of 599 metres.

Our Work

Our work included providing reinforcement drawings for the tunnel and other infrastructure, along with BIM services to ensure smooth integration and precise execution throughout the project.

Location

Marktoberdorf and Bertoldshofen, Germany

Services

  • Structural Design, work stage 5 (LP5)
  • Reinforcement drawings
  • BIM Services

Segment

Transportation & Infrastructure Projects

Segments

Segments

Projects

Projects

Ready to build a long-lasting legacy?

Partner with a leading expert to discuss your project requirements and bring your vision to life