Frankfurt am Main, Germany
The new Terminal 3 building is to be built in the south of Frankfurt Airport to handle passenger traffic. The project consists of the access bridge at Frankfurt Airport Terminal 3, based on foundations, which in turn are supported by drilled piles.
The entire object comprises approx. 14.475 sqm gross floor area.
Photo: Jakob Wert/ Frankfurt Airport
We focus on optimizing the foundations with drilled piles to ensure long-term stability, while leveraging BIM for enhanced collaboration, accurate modeling, and cost-effective construction management.
Location
Gross Floor Area
Services
Segment
Partner with a leading expert to discuss your project requirements and bring your vision to life