Projects

Kirchberg Tunnel

Black Forest, Germany

Project Description

The Kirchberg tunnel was retrofitted with: 
- 10 SOS niches in the main tunnel (4 different types)
- 6 locks connected to the main tunnel (5 different types)
- 1 tunnel block (length < 10 m) subsequently connected to the main tunnel (electric tunnel) using the mining method, including connection to the main tunnel

Our Work

Our work included providing formwork and reinforcement drawings and BIM services to ensure precision and effective project management throughout.

Location

Black Forest, Germany

Services

  • Structural Design, work stage 5 (LP5)
  • Formwork and reinforcement drawings
  • BIM Services

Segment

Transportation & Infrastructure Projects

Segments

Segments

Projects

Projects

Ready to build a long-lasting legacy?

Partner with a leading expert to discuss your project requirements and bring your vision to life