Black Forest, Germany
The Kirchberg tunnel was retrofitted with: - 10 SOS niches in the main tunnel (4 different types) - 6 locks connected to the main tunnel (5 different types) - 1 tunnel block (length < 10 m) subsequently connected to the main tunnel (electric tunnel) using the mining method, including connection to the main tunnel
Our work included providing formwork and reinforcement drawings and BIM services to ensure precision and effective project management throughout.
Location
Services
Segment
Partner with a leading expert to discuss your project requirements and bring your vision to life