Frankfurt am Main, Germany
Construction of the FRA 3 Data Center, consiting of a main building and a substation. The main building comprises three upper floors and two basement floors. The upper floors (levels 0 to 2) contain the server rooms (data halls) and an office block while the basement floors are mainly used for technical and storage rooms.
Upon commencement of its operations, the Data Center is anticipated to generate 30 to 36MW of IT power over its nine data halls.
The entire object comprises approx. 29.900 sqm gross floor area.
Our role includes the design and planning of the main building, which houses nine data halls, office spaces, and technical rooms across its five floors. We ensure the integration of sustainable and high-performance systems to accommodate the data center’s 30 to 36MW IT power needs.