Grünheide, Germany
The object is the new construction of the water treatment (WWT), a wasteyard and a stamping facility of the Tesla Gigafactory Berlin-Brandenburg.
The entire object approx. 34.000 sqm gross floor area. Specifically, The WWT building comprises a ground floor and an upper floor with a GFA of 7.600 sqm. The wasteyard is a single story building with 7.900 sqm GFA. The stamping is a 18.500 sqm building.
To complete the project at the Tesla Gigafactory Berlin-Brandenburg, we provided structural design and engineering services for the water treatment (WWT) facility, wasteyard, and stamping facility.
Location
Gross Floor Area
Services
Segment
Partner with a leading expert to discuss your project requirements and bring your vision to life