Projects

Gerebit Lichtenstein

St. Egidien, Germany

Project Description

The building project involves the construction of a new sprinkler control center and two single-story halls (H3 and H4) with covered outdoor storage for production and logistics directly adjacent to an existing hall (H1). Hall H3 is separated from halls H1 and H4 by movement joints in the roof level. The entire object comprises approx. 11.800 sqm gross floor area.

 

The individual partial buildings have the following dimensions:
- Hall 3: 197.91 m x 35.00 m x 10.00 m
- Hall 4: 75.6 m x 40.7 m x 10.00 m
- Sprinkler control center: 9.70 m x 9.70 m x 3.50 m 

 

Photo: rewa Planungsgesellschaft mbH

Our Work

We provided structural design services for the new sprinkler control center and two single-story halls (H3 and H4) with covered outdoor storage for production and logistics. Our responsibilities included ensuring structural integrity, safety, and efficiency for all buildings, addressing movement joints between halls, and meeting the project's engineering requirements.

Location

St. Egidien, Germany

Gross Floor Area

11.800 sqm

Services

  • Structural Design, work stage 2-6 (LP2-6) 
  • Workshop Design for Precast Elements
  • BIM Services

Segment

Industrial Projects

Segments

Segments

Projects

Projects

Ready to build a long-lasting legacy?

Partner with a leading expert to discuss your project requirements and bring your vision to life